Light Commercial Rooftop Unit Service SOP
Purpose
Standardize service for light commercial rooftop units (RTUs) - the packaged HVAC systems on small office, retail, restaurant, + light industrial buildings. RTU service is the bridge from residential HVAC to commercial; pricing + scope are different + more profitable per labor hour.
Scope
Single-package + split RTUs from 3-25 tons. Common brands: Carrier 48HC, Trane Voyager + Precedent, Lennox LRP, York Sunline, Daikin Rebel. Excludes large commercial chillers + air-handling units (separate trade).
Prerequisites
- HVAC license valid for commercial work
- EPA 608 Universal (or Type II minimum)
- Fall protection per OSHA (roof work)
- Ladder + roof access plan
- Toolset: standard HVAC + commercial-specific (megger, amp clamp 100A+, water-column manometer)
- Refrigerant per system label (R-410A still common in fleet; R-454B + R-32 for 2025+ replacements)
- Combustion analyzer (gas-fired RTUs)
- 2-3 hours per typical annual visit
Pre-arrival
- Confirm rooftop access (door from interior OR external ladder)
- Coordinate with building manager / tenant
- Note any specific complaints
- Pull last service history if available
Procedure
Step 1: Site assessment + safety
- Roof access PPE: fall protection per OSHA above 4 ft
- Walk roof; identify hazards (skylights, soft spots, recent storm damage)
- Verify unit location matches work order
- Read unit nameplate: voltage, amps, refrigerant type, model, serial, manufacture date
- Note physical condition: rust, hail damage, panel security
Step 2: Electrical safety
- Lockout/tagout main disconnect for safety inspection
- Verify with meter at terminals
- Inspect electrical panel: connections, scorching, wire condition
- Replace any wire nuts or terminations showing heat damage
Step 3: Filters
- Note filter size + MERV rating
- Replace OR clean per system
- Most commercial RTUs use 2" 16x25 pleated filters (multiple positions); typical 4-6 filters per unit
- Document filter change date for next service interval
Step 4: Coils
- Outdoor (condenser) coil: visual + clean
- Indoor (evaporator) coil: inspect from filter side; check drain pan
- Coil cleaning if needed: foaming coil cleaner, pressure rinse from rooftop access
- Watch coil fin damage; comb if needed
Step 5: Belt drives (older units)
- Inspect belt for wear, cracks, glazing
- Check tension (typical: deflect 1/2" with thumb pressure)
- Replace if worn
- Note belt size + model for future service
Step 6: Bearings + lubrication
- Spin fan + blower wheels; listen for rumble or grinding
- Lubricate bearings per manufacturer (zerk fittings if equipped)
- Belt drive blowers usually have grease zerk; direct drive sealed
Step 7: Refrigeration check
- Connect manifold to service valves
- Run system 15+ minutes to stabilize
- Record suction + discharge pressures
- Calculate superheat (TXV systems) or subcooling (most modern)
- Compare to manufacturer chart
- Note any anomalies
Step 8: Combustion (gas heat)
- Confirm gas supply pressure (typical 5-7 in WC inlet, 3-3.5 in WC at burner manifold)
- Light burner; observe flame
- Combustion analyzer in flue: CO2 8-9%, CO < 100 ppm, draft -0.02 to -0.10 in WC
- Inspect heat exchanger for cracks (mirror + flashlight)
- Verify limit + roll-out controls
- Check vent integrity
Step 9: Economizer (if equipped)
- Test full operating range
- Outdoor air damper opens at acceptable outdoor conditions
- Linkage operating freely
- Calibrate sensors
- Verify minimum outside-air position (ASHRAE 62.1 commercial ventilation)
Step 10: Controls + thermostat
- Test heating + cooling stages
- Verify fan operation
- Test economizer integration
- Check thermostat batteries (commercial usually 24V; some battery-backed)
- Set commercial schedule per tenant
Step 11: Drains
- Condensate drain clear
- Pan tilt verified
- Trap intact + filled
- Overflow safety switch tested
Step 12: Document + close
- Service report with all readings
- Recommendations list (repairs, upgrades)
- Customer signature
- Photos of completed work
- Lock back up
Acceptance criteria
- All function tests passed
- Readings within manufacturer specs
- Filters replaced/cleaned
- Combustion within spec (gas units)
- Drain functional
- No active alarms
- Customer signed work order
Common pitfalls
- No lockout/tagout: serious injury risk on commercial 3-phase
- Skipping economizer check: tenant complaint about IAQ + energy waste
- Wrong gauge type: commercial sometimes 3-phase + different connections
- Combustion not analyzed: CO levels not verified
- Drain trap dry: pulls air through pan, dries out, develops smell
- Missing the heat exchanger crack: CO into the building, life-safety
- No service report: tenant + property manager disputes work
Safety considerations
- Roof work: harness, anchor point, ladder safety
- High-voltage 3-phase: PPE, glove rating, voltmeter testing before touching
- Refrigerant under pressure: gauges + recovery
- Combustion: CO testing every time
- Tight rooftop spaces: heat exhaustion risk in summer
- Confined-space if working inside ductwork section
Differences from residential
- Higher voltages (208/230/460 3-phase common)
- Multi-stage equipment + economizer
- Tenant management coordination
- Service contracts vs one-off calls
- Commercial spec sheets + AHJ documentation
- ASHRAE 62.1 ventilation requirements
- Documentation more important for property manager records
- Multiple units per property = recurring revenue at scale
Customer talking points
For property managers:
- "Annual contract covers $X per unit, includes [coverage list]"
- "Identifies issues early; saves 30-50% vs reactive repair on average"
- "Building uptime + tenant comfort"
- "Compliance documentation for ASHRAE 62.1 + insurance"
- "Predictable budget vs surprise major-repair calls"
Multi-unit property managers respond to ROI + uptime, not technical detail.
The single most profitable RTU service tool is a tablet-based service report customer signs onsite. Photo each completed item; auto-populate the report with readings; PM signs + the customer keeps the file. Property managers paying for service want documentation more than they want lower prices. A signed digital report at the time of service closes 80%+ of annual contract renewals.
References
- ASHRAE 62.1 Ventilation for Acceptable Indoor Air Quality (commercial)
- ASHRAE 90.1 Energy Standard for Buildings (commercial)
- AHRI 340/360 Performance Rating (packaged equipment)
- NFPA 90A + 90B (commercial HVAC)
- Manufacturer service manuals
- Manuall internal: Annual HVAC System Maintenance, Refrigerant Leak Diagnosis Troubleshooting