New Construction Service Work Reference

Why this matters

New construction work differs from service: tract builders, custom builds, additions, remodels. Volume often high; margins lower; competition intense. The tech who handles new construction well builds significant B2B revenue. This is the field card.

New construction landscape

Types:

  • Tract / production builders: high volume, standardized
  • Custom builders: single home, specific design
  • Spec builders: built without buyer; sold completed
  • Renovations / additions: existing structure modified
  • Multi-family: apartments, condos, townhomes

Each has different dynamics.

Builder relationship

Builder typically:

  • Coordinates multiple trades
  • Pays subs
  • Manages customer relationship
  • Schedules
  • Sets specifications

Your role:

  • Specific trade scope
  • Within builder's timeline
  • Quality + speed
  • Coordination with other trades

Differences from service

Service:

  • Customer is occupant
  • Direct relationship
  • Higher margin
  • Quality differentiation matters
  • Reputation built per customer

New construction:

  • Customer is builder
  • Indirect to occupant
  • Lower margin (volume)
  • Speed + reliability matter
  • Reputation built per builder

Bid + contract

For builder work:

Bid process:

  • Builder requests pricing
  • Specific scope
  • Per square foot OR per house
  • Standardized for tract

Contract terms:

  • Pricing
  • Scope
  • Schedule
  • Payment terms
  • Warranty
  • Insurance requirements

Master contract:

  • Sometimes for ongoing
  • Covers multiple homes
  • Per-house orders separate

Volume + pricing

Tract builders:

  • High volume
  • Standardized plan
  • Lower pricing
  • Faster work expected

Custom:

  • Lower volume
  • Variable scope
  • Higher pricing per job
  • More attention per job

Find your spot:

  • Some companies specialize
  • Some mix
  • Margin vs volume tradeoff

Sequencing on new construction

Typical sequence (residential):

  1. Site work (clearing, excavation, foundation)
  2. Foundation (footings, walls, slab)
  3. Framing (floor, walls, roof)
  4. Mechanical rough-in:
    • HVAC (ductwork)
    • Plumbing (supply + drain rough)
    • Electrical (panel + circuits + boxes)
  5. Insulation
  6. Drywall (hang, tape, finish)
  7. Paint
  8. Trim work (cabinets, doors, trim)
  9. Flooring
  10. Mechanical finish:
    • HVAC (equipment, registers)
    • Plumbing (fixtures)
    • Electrical (devices, fixtures)
  11. Final inspection
  12. Closing / occupancy

Your work fits within sequence.

Coordination

Pre-construction meeting:

  • All trades present
  • Schedule reviewed
  • Conflicts identified
  • Customer expectations

Weekly progress:

  • Update on schedule
  • Issues raised
  • Coordination needed

Per-trade meetings:

  • Issue-specific
  • Direct coordination

Drawings + specifications

Provided to subs:

  • Full set of drawings
  • Specifications document
  • Equipment schedules
  • Engineering details

You're responsible for:

  • Knowing your scope from drawings
  • Asking questions (RFI)
  • Coordinating with other trades

Scheduling

You're "pulled" when ready:

  • Builder notifies when site ready
  • You schedule promptly
  • Don't show before site ready

You're "released" when done:

  • Builder confirms work complete
  • Inspection cleared
  • Move to next site

Inspections

Each phase has inspection:

  • Rough-in inspections
  • Final inspections
  • Building inspector
  • Trade-specific

Your responsibility:

  • Work passes inspection
  • Address corrections promptly
  • Schedule inspection (sometimes; builder usually)

Coordination with other trades

Common conflicts:

Plumbing wants this wall; HVAC also:

  • Coordinate routes
  • Often plumbing first (more restrictive)

Electrical box conflicts with plumbing:

  • Adjust
  • Coordinate before either commits

HVAC return conflicts with electrical chase:

  • Reroute
  • Discuss before completion

Quality vs speed

Builder pressure:

  • Speed essential
  • Margin tight
  • Multiple subs

Don't sacrifice quality:

  • Builder respects quality
  • Code compliance non-negotiable
  • Callbacks during warranty cost everyone

Balance: efficient quality work.

Materials handling

For builder work:

  • Often builder supplies materials
  • OR you supply per agreement
  • Delivery + staging coordination
  • Theft / damage prevention

Site organization:

  • Don't store excessive material
  • Don't block work areas
  • Move when needed

Payment terms

Builder payment typically:

  • Net 30 from invoice
  • Per-house OR per-trade payment
  • Sometimes draws (initial, progress, final)
  • Sometimes lien waivers required

Cash flow management:

  • Builder pays after you complete
  • Multiple builders + projects = cash flow planning
  • Track receivables religiously

Lien rights

For unpaid work:

  • Mechanic's lien against property
  • State-specific notice + filing
  • Important leverage
  • Common in commercial / new construction

Insurance + bonding

Builder requires:

  • Liability insurance
  • Workers' comp
  • Bond (sometimes)
  • Certificate of insurance (COI)
  • Additional insured designation

Without these: builder can't legally use you.

Permit + license

Subs responsible:

  • Trade-specific permits
  • Licensed for trade
  • Inspections coordinated

Builder pulls:

  • Building permit
  • Overall coordination

Documentation

For each new construction job:

  • Signed contract
  • Drawings (your copy with notes)
  • Change orders
  • Inspections records
  • Photos of work
  • Invoices
  • Customer signature (final acceptance)

Punch list

End of project:

  • Builder + customer walkthrough
  • Outstanding items identified
  • Per-trade items addressed
  • Sign-off

You return to address punch items.

Warranty

Builder warranty:

  • Typically 1 year on workmanship
  • Manufacturer warranties on equipment

Your warranty:

  • Per your trade's standard
  • Matches OR exceeds builder warranty
  • Define in contract

Specific trade considerations

HVAC:

  • Manual J calculations
  • Equipment sizing
  • Ductwork rough-in
  • Equipment install (final)
  • Commissioning

Plumbing:

  • Underground (slab homes) before pour
  • In-wall rough
  • Fixture install final
  • Test all systems

Electrical:

  • Service entry
  • Panel install
  • Rough-in (boxes + wire)
  • Finish (devices + fixtures)
  • Test all circuits

Roofing:

  • Decking inspection
  • Underlayment
  • Shingles
  • Flashing
  • Final inspection

Common new-construction mistakes

  • Showing up before site ready
  • Working before drawings finalized
  • Damaging other trades' work
  • Skipping inspection step
  • Not coordinating with builder
  • Slow communication
  • Surprises late in project
  • Forgetting to register warranties

Builder relationship building

For long-term:

  • Reliable scheduling
  • Quality work
  • Fair pricing
  • Communication
  • Punch list completion
  • Warranty response

Reliable subs become preferred subs.

When builder is wrong

References

  • IBC / IRC building codes
  • AGC (Associated General Contractors)
  • NAHB (National Association of Home Builders)
  • State contractor licensing
  • Manuall internal: Working With General Contractors, Multi-Trade Remodel Coordination