Why this matters
EV adoption is growing rapidly. Customers want home charging installed. Each install involves electrical, possibly service upgrade, permits, customer education. The tech who handles EV installs well captures growing market opportunity. This is the field card.
EV charger basics
Level 1 (120V):
- Standard outlet
- 12-20 amps typical
- 3-5 miles range per hour
- Slow but works for low-mileage commuters
- No installation needed (usually)
Level 2 (240V):
- Dedicated circuit
- 16-80 amps (typically 30-50)
- 25-40 miles per hour
- Standard home charging
- Installation required
Level 3 / DC Fast Charge:
- Commercial / public
- 50-350 kW
- 100-300 miles per hour
- Not residential typically
Most home installs: Level 2.
Charger types
Hardwired:
- Wires direct to charger
- Permanent install
- No removability
- Cleaner appearance
Plug-in (NEMA 14-50 OR 6-50):
- Plug into receptacle
- Removable (warranty / replacement)
- Customer can take if moving
- More versatile
Most installs: customer's preference.
Charger output sizing
Match charger to:
- Vehicle's max acceptance rate
- Circuit capacity
- Customer's charging needs
Common ratings:
- 16 amp / 3.8 kW (smaller; entry)
- 32 amp / 7.7 kW (most popular)
- 40 amp / 9.6 kW
- 48 amp / 11.5 kW (some EVs accept; larger circuit needed)
Most vehicles charge at 32-48 amps max.
Service capacity
Load calculation needed:
- Existing load
- EV charger load
- Total within service capacity?
- Per NEC requirements
100A service:
- Usually adequate for 32A charger (with load mgmt)
- Maybe not for 48A
- Sometimes need upgrade
150A service:
- Usually fine for 32-40A charger
- Some 48A installs OK
200A service:
- Almost always adequate
- Most EV installs work
Upgrade required if calculation shows over-capacity:
- Service upgrade significant cost
- Customer should know upfront
Load management
Modern smart chargers offer:
- Auto-detection of available capacity
- Reduce output when other loads active
- Maximize available power without upgrade
- Sometimes avoids service upgrade
Brands: Wallbox, ChargePoint Home Flex, etc.
Installation steps
Customer consultation:
- Vehicle specs
- Daily mileage
- Charging needs
- Future-proof considerations
Site assessment:
- Panel location
- Garage / parking spot
- Run distance + path
- Mounting location
Load calculation:
- Existing electrical load
- Determine charger size
- Service upgrade needed?
Permit pulled (typically required)
Circuit installation:
- Conductor sized for circuit
- Conduit / cable routing
- Breaker installed
- GFCI requirement (per NEC)
Charger mount + connection:
- Per manufacturer install
- Wall mount typical
- Outdoor: weather-rated
Inspection
Commissioning:
- Test charger operation
- Verify safety
- Customer training
Permit + inspection
Typically required:
- Electrical permit
- Inspection of work
- Some jurisdictions: special EV-related permit
Don't skip; insurance + safety + code compliance.
NEC requirements
Article 625 (Electric Vehicle Charging):
- EVSE (Electric Vehicle Supply Equipment) requirements
- GFCI for plug-in (most jurisdictions)
- Disconnect requirements
- Working clearances
Continuous load:
- EV charging = continuous load
- Circuit must be 125% of continuous load
- 40A continuous = 50A circuit
- 32A continuous = 40A circuit
Wire sizing
Per NEC:
- 50A circuit: #6 AWG copper (60-degree column) OR #8 (75-degree)
- 40A circuit: #8 AWG copper (60) OR #10 (75)
- 30A circuit: #10 AWG copper
Distance + voltage drop: may upsize wire.
Conduit vs cable
Conduit (rigid OR EMT):
- Garage installation
- Exposed runs
- Code requirement many places
- More expensive
Cable (NM-B "Romex"):
- Inside walls
- Concealed
- Less expensive
- Code-compliant when allowed
Outdoor:
- UF-B (underground feeder) OR conduit
- Weather-rated
- Buried per code
Outdoor installation
Considerations:
- Weather-rated charger
- GFCI protection
- Weather-rated receptacle (if plug-in)
- Conduit through wall (sealed)
- Proper mounting
Code:
- NEC Article 625
- Manufacturer requirements
Mounting
Wall mount:
- Stud locations
- Lag bolts OR similar
- 4-5 ft from floor typical (height varies)
- Customer's preference
Pedestal:
- Free-standing post
- Outdoor / parking lot
- More expensive
Customer education
After install:
- How to use
- Charging schedule (peak vs off-peak)
- Cost (their electric rate × kWh)
- Maintenance (minimal)
- Warranty + support
- App use if smart charger
Vehicle compatibility
Most EVs accept:
- J1772 standard (Level 2)
- Universal (any J1772 EVSE works)
Tesla:
- Tesla connector OR adapter
- Some Tesla chargers also have J1772
- Mobile Connector (Tesla) accepts NEMA outlet directly
Customer's vehicle determines connector but most chargers compatible via adapter.
Common installation challenges
Garage to panel distance:
- Long run = larger wire
- Voltage drop calculation
- Cost increases
Panel doesn't have space:
- Tandem breakers (sometimes)
- Sub-panel needed
- Significant cost increase
Older home with 100A service:
- Service upgrade often required
- Significant cost
- Customer education
Outdoor install:
- Weather-rated equipment
- GFCI complexity
- Higher cost than garage
Detached garage:
- Long run from house
- Often new sub-panel
- Significant scope
Smart vs basic chargers
Smart features:
- Wi-Fi connectivity
- App control
- Schedule charging (off-peak)
- Track usage
- Load management
- Demand response (utility integration)
Basic charger:
- Just charges
- No app
- Simpler
- Less expensive
Customer's choice; smart often pays back via off-peak charging.
Rebates + incentives
Federal (current):
- 30% tax credit (some installs)
- Limits + qualifications apply
State:
- Varies; many states offer rebates
Utility:
- Often offer rebates
- Time-of-use plans
- Off-peak charging programs
Customer should investigate before install; may affect choice.
Existing residential service
When customer adds EV charger:
- Existing loads continue
- EV adds significant load
- Peak demand charges (commercial) may apply
- TOU plans (time of use) favorable for off-peak
Multiple EVs
Customer with 2+ EVs:
- One charger per car OR shared
- Sequential charging possible
- Larger service needed
- Smart charger with multiple outputs
- Discuss customer's actual needs
Mobile connector (portable)
Sometimes customer doesn't want fixed charger:
- Mobile connector to NEMA 14-50 outlet
- Travel use
- Backup if fixed fails
Outlet install only (no charger).
Sub-panel for EV
References
- NEC Article 625 (Electric Vehicle Charging)
- SAE J1772 (charging connector standard)
- DOE EV resources
- Manufacturer install manuals (Tesla, ChargePoint, Wallbox, etc.)
- Manuall internal: EV Charging Install, EV Load Management